
PRO-SEA competed diving work for one of the country’s largest shipyards for an underwater box cooler modification of a ship. Existing gratings of the sea cabinets have been burned away and other gratings have been replaced. Then fairwaters were placed to better control the flow of the water. This was part of a hydrodynamic study of the shipyard.